All Service

FRP Package STP in Bangladesh | Compact & Cost-effective Sewage Treatment

FRP Package STP in Bangladesh | Compact & Cost-effective Sewage Treatment

Looking for an efficient sewage treatment solution in Bangladesh? Learn about FRP Package STP, its benefits, working process, cost, and installation requirements.

One of the most advanced and cost-effective solutions available today is the FRP (Fiberglass Reinforced Plastic) Package STP. It is compact, durable, and easy to install, making it an ideal choice for factories, hotels, residential areas, and commercial buildings.

In this blog, we will cover everything you need to know about FRP Package STP in Bangladesh, including its benefits, working principles, installation process, and cost.

These plants come in pre-designed modular units, making them easy to transport and install. They efficiently treat domestic and industrial wastewater, ensuring compliance with Department of Environment (DoE) Bangladesh regulations.

Compact design – Requires less space compared to conventional STPs
Pre-engineered – Ready-to-install units reduce setup time
Corrosion-resistant – Ensures long lifespan in Bangladesh’s humid climate
Low maintenance – Minimal operational costs and easy servicing
Environmentally friendly – Ensures treated water meets discharge standards

Here are some reasons why FRP Package STP is the best choice for sewage treatment in Bangladesh:

Land scarcity is a major issue in Dhaka, Chattogram, Gazipur, and Narayanganj. FRP STP’s compact and modular design makes it ideal for areas where space is a concern.

  1. Cost-Effective Solution
  • Faster to install (reducing labor costs)
  • Lower in maintenance (reducing operational expenses)
  • More energy-efficient (saving electricity costs)
  1. Compliance with Bangladesh’s Environmental Laws

The Department of Environment (DoE), Bangladesh, mandates proper wastewater treatment before discharge. FRP Package STP ensures that treated water meets:

  • Environmental Conservation Rules, 1997
  • Bangladesh National Building Code (BNBC)
  • Local WASA and DPHE wastewater guidelines
  1. Suitable for Various Sectors
  • Garment & textile industries
  • Hotels & resorts
  • Residential & commercial buildings
  • Hospitals & educational institutions
  • Shopping malls & corporate offices

The FRP Package Sewage Treatment Plant follows a multi-stage treatment process to purify wastewater before discharge.

  1. Primary Treatment (Screening & Sedimentation)
  • Removes solid particles, oils, and grease from sewage.
  • Reduces suspended solids and organic matter.
  1. Secondary Treatment (Biological Treatment – MBBR Process)
  • Uses Microbial Biofilm Reactor (MBBR) to break down organic pollutants.
  • Ensures effective biological treatment with minimal sludge production.
  1. Tertiary Treatment (Filtration & Disinfection)
  • Activated carbon filters remove odor, color, and fine particles.
  • UV or chlorine disinfection ensures pathogen-free treated water.
  1. Sludge Handling & Disposal
  • Treated sludge is safely disposed of or used as fertilizer for agriculture.

Installing an FRP Package STP in Bangladesh is quick and easy. The installation process typically involves the following steps:

Site Selection: Identifying an appropriate space for plant installation.
Excavation & Foundation: Preparing a concrete base or underground pit.
Unit Placement: Positioning and assembling the pre-fabricated FRP units.
Piping & Connections: Connecting inlet, outlet, and discharge pipelines.
Electrical & Control Panel Setup: Installing pumps, blowers, and control panels.
Testing & Commissioning: Running trial operations to ensure efficiency.

Installation typically takes 7-15 days, depending on plant capacity.

The cost of an FRP Package Sewage Treatment Plant depends on:

  • Capacity (KLD) – 10 KLD, 50 KLD, 100 KLD, etc.
  • Treatment technology – MBBR, SBR, or Activated Sludge Process
  • Additional features – Automation, remote monitoring, sludge handling

For a customized quotation, contact PureLife RO Systems, Bangladesh’s leading FRP Package STP supplier.

Maintenance & Servicing of FRP Package STP
Regular maintenance ensures efficient operation and longevity of the STP.

Inspect pumps and blowers monthly
Check microbial activity in the biological reactor
Clean filters and screens every 3-6 months
Desludge periodically to prevent blockages
Test treated water quality regularly

With proper maintenance, an FRP STP can last over 15 years with minimal operational costs.

If you are looking for a compact, cost-effective, and environmentally friendly sewage treatment solution, FRP Package STP is the ideal choice. Its quick installation, low maintenance, and high durability make it perfect for industries, residential complexes, and commercial buildings in Bangladesh.

PureLife RO Systems Specializes in designing, supplying, and installing FRP Package STPs across Dhaka, Chattogram, Narayanganj, and other industrial zones.

For consultation and pricing, contact PureLife RO Systems today!

Call: +8801919998881
Email: info@purelifebd.com
Visit: www.purelifestp.com

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.