PureLife EcoPack STP.
Built for Bangladesh.
A factory-assembled, plug-and-treat sewage treatment plant in a single FRP shell — engineered for load-shedding, monsoon inflow and DoE compliance. From apartment blocks in Uttara to garments factories in Gazipur, one plant treats it all.
Proven where it counts.
The PureLife EcoPack Packaged STP.
EcoPack is a factory-built sewage treatment plant — screening, equalisation, anaerobic and aerobic biological treatment, clarification and disinfection integrated inside a single fibreglass-reinforced plastic (FRP) vessel. Designed for Bangladeshi conditions — grid outages, high water tables and heavy monsoon inflow — it replaces sprawling RCC tanks and years-long civil work with a plant you can commission in under a week.
Why buildings choose it
Built to comply
Configured to meet Department of Environment (DoE) discharge norms and the Environment Conservation Rules, ready for reuse in flushing and landscaping.
DoE ECR-2023 CETP / STP norms Reuse-ready outlet RAJUK-friendly footprint Green-building compatibleHow the treatment works.
Screening
Coarse solids and grit removed before they reach the biology.
Equalisation
Buffers peak-hour and monsoon inflow into a steady, even load.
Anaerobic
First-stage biological breakdown reduces organic load.
MBBR Aerobic
Moving-bed media grows the biomass that does the heavy lifting.
Clarifier
Settles treated water clear; sludge is returned or wasted.
Disinfection
Chlorine / UV polish delivers reuse-grade, safe outlet water.
Find your EcoPack. 1 KLD to 500 KLD.
Two form factors: Capsule (1–10 KLD, horizontal — for villas, small hotels, offices) and Cylinder (20–500 KLD, vertical — for apartments, hospitals, factories, IT parks). Indicative pricing below is all-inclusive of design, manufacture, installation and commissioning. Transportation and civil works are extra.
| Model | Capacity | Best for | Footprint (L×W×H) | Form | Indicative price (৳) |
|---|---|---|---|---|---|
| EC-1 | 1 KLD | Villa · 5 PE | 1.8 × 1 × 1.6 m | Capsule | 2.15 L |
| EC-2 | 2 KLD | Bungalow · 10–15 PE | 1.8 × 1 × 1.6 m | Capsule | 2.95 L |
| EC-5 Popular | 5 KLD | Small office, apartment, hotel · 30 PE | 2.3 × 1.5 × 1.8 m | Capsule | 5.5 L |
| EC-10 Popular | 10 KLD | Small hotel, industry, apartment · 50–60 PE | 3.4 × 1.8 × 2.0 m | Capsule | 9 L |
| EC-15 Popular | 15 KLD | Hotel, industry, apartment, school · 85 PE | 2.3 m Ø × 3.7 m L | Cylinder | 10.75 L |
| EC-20 Popular | 20 KLD | Hotel, industry, apartment, school, hospital · 110 PE | 2.3 m Ø × 5 m L | Cylinder | 12.5 L |
| EC-25 Popular | 25 KLD | Hotel, industry, apartment, school, hospital · 140 PE | 2.5 m Ø × 5 m L | Cylinder | 13.5 L |
| EC-50 Popular | 50 KLD | Hotel, industry, apartment, school, hospital, IT park · 250–300 PE | 2.5 m Ø × 9 m L | Cylinder | 22 L |
| EC-75 | 75 KLD | Hotel, industry, apartment, school, hospital, IT park, industrial campus · 450 PE | 2.5 m Ø × 12 m L | Cylinder | 32 L |
* PE = Person Equivalent at 180–200 LPCD. Prices indicative as on May 2026. Custom skids and multi-unit configs available beyond 500 KLD.
The Sequencing Batch Reactor (SBR) Sewage Treatment Plant.
For projects that demand the highest outlet quality in the smallest footprint, PureLife builds SBR-based sewage treatment plants. SBR treats sewage in timed batches inside a single tank — aeration, settling and decanting all happen in one basin, one cycle at a time — giving you sharper control, cleaner water and a compact plant that fits Bangladesh’s tight urban sites.
What is an SBR Sewage Treatment Plant?
A Sequencing Batch Reactor is a fill-and-draw activated-sludge system. Instead of flowing continuously through separate tanks, sewage is treated in repeating time-based cycles within one reactor. The same basin fills, aerates, settles and decants in sequence — so a single tank does the work of several.
Why choose SBR over conventional STP?
The 5 Stages of an SBR Cycle.
Fill
Screened sewage enters the reactor basin until the working volume is reached.
React (Aerate)
Blowers supply oxygen; microorganisms break down the organic load.
Settle
Aeration stops and biomass settles as a clear supernatant forms above.
Decant
The clarified treated water is drawn off the top by the decanter.
Idle / Sludge
Excess sludge is wasted and the basin resets for the next batch.
Key Benefits of PureLife SBR Plants
Smallest footprint per m³ Superior nutrient removal No return-sludge pumping loop Absorbs peak & shock loads Fully automated PLC control Low operator dependence Consistent DoE-grade outlet Easy future expansionSBR Plant Technical Specifications
Where SBR Plants Fit Best.
Large residential townships
High, variable domestic flows where footprint and outlet quality both matter.
Hotels & commercial complexes
Batch control keeps effluent consistent despite fluctuating occupancy.
Industrial & garments estates
Handles shock loads and delivers reuse-grade water for factory operations.
Outlet quality that exceeds DoE norms.
Performance vs. norms
Approved reuse applications
Toilet flushing Landscape & gardening Cooling-tower make-up Floor & road washing Fire-tank top-up Construction curing Groundwater recharge Safe DoE dischargeThe honest side-by-side.
EcoPack is engineered to be objectively better than the two systems most builders default to: a civil RCC ASP plant, and a bare-bones MS-tank packaged STP from a generic supplier.
| Attribute | PureLife EcoPack | Civil RCC STP (ASP) | Generic MS Packaged STP |
|---|---|---|---|
| Treatment technology | Anaerobic + MBBR (dual) | ASP / Extended aeration | SAFF or basic MBBR |
| Vessel material | 100% FRP — corrosion-proof, 50-yr life | RCC — joints leak after 5–8 yrs | Mild Steel / epoxy — 10–15 yrs |
| Footprint (per KLD) | ~ 0.6 m²/KLD | ~ 1.5 m²/KLD | ~ 0.9 m²/KLD |
| Install time (50 KLD) | 3–5 days | 4–8 weeks | 2–3 weeks |
| Power consumption | Low (silent diaphragm) | High (continuous aeration) | Moderate |
| On-site operator | Not required (auto + IoT) | Full-time required | Part-time required |
| Sludge generation | ~30% less than ASP | High | Moderate |
| CPCB Class A outlet | ✓ Exceeds | Variable | Borderline |
| Reuse-ready | Direct flushing & irrigation | Needs tertiary | Needs tertiary |
| OCEMS / SCADA | PLC + IoT, OCEMS-ready | Add-on cost | Rare |
| Warranty | 10-yr module + lifetime service | 1 year | 1–2 years |
| Total 25-yr cost (50 KLD) | Lowest TCO | +35% (rebuild after yr 12) | +18% (replace yr 12) |
Why EcoPack wins the spec.
FRP for life
Fibreglass shell that won’t rust, rot or crack.
Less footprint
Fits basements, rooftops and tight Dhaka plots.
Fast install
Delivered pre-assembled — set, connect, run.
Lower energy
Efficient blowers keep running through outages.
Civil headaches
No tank-casting, no long site works.
Silent
Quiet enough for residential basements.
Shell warranty
Backed by AMC and a local spares network.
Fast quote
Share your flow, get a quote next day.
From a villa to a smart city.
Apartments & complexes
Compact STPs for residential towers in Uttara, Bashundhara and Gulshan.
Hotels & resorts
Odour-free treatment sized for guest loads and reuse in landscaping.
Hospitals & clinics
Reliable disinfection for sensitive medical waste streams.
Schools & universities
Low-maintenance plants for campuses and hostels.
Garments & factories
DoE-compliant sewage handling for industrial sites in Gazipur & Narayanganj.
Townships & smart cities
Modular banks that scale with new development phases.
We handle the paperwork.
PureLife manages DoE clearance, ECR conformity and site documentation — so you commission cleanly and stay compliant.
DoE Clearance
Environmental clearance and discharge consent handling.
ECR-2023
Designed to Environment Conservation Rules standards.
RAJUK / City Corp
Footprint and layout that fit municipal requirements.
Reuse permits
Outlet certified for flushing and irrigation reuse.
Factory / BIDA
Compliance support for industrial and EPZ projects.
Green building
Documentation compatible with LEED / green certification.
Running in under 4 weeks.
Survey & Design
Flow assessment and plant sizing at your site.
Fabrication
FRP vessel built and pre-plumbed at our works.
Site Prep
Minor base and connections readied in parallel.
Delivery & Set
Unit delivered and placed in 3–5 days.
Commission
Start-up, testing, handover and training.
Installed and running across Bangladesh.
25-Flat Apartment Complex
A basement EcoPack keeping a Sector-11 tower reuse-ready and odour-free.
Multi-Specialty Clinic
Disinfection-first treatment for a sensitive medical waste stream.
Garments Campus STP
A modular EcoPack bank scaling with a growing factory workforce.
Nationwide service, one team.
Our engineering base in Uttara Dhaka serves projects across every division — with fast delivery and local service.
Answers, straight up.
What is the PureLife EcoPack STP?
What is the price of an EcoPack packaged STP in Bangladesh?
How is FRP better than a concrete RCC STP?
Can treated water be reused?
Is it DoE approved?
How long does installation take?
What warranty and service do you offer?
What about power outages? Does the plant cope?
We quote in 24 hours.
Share your building type, occupancy and daily flow (or just the number of flats/persons) and our engineers size the right EcoPack for you. No obligation.